Month / February 13, 2013

    Loading posts...
  • Selecting low bid…is it always the best choice?

    First and foremost owners should never collect estimates on larger remodeling projects (generally anything over $10K is large) from a contractor without seeking design consultation.  During the design phase pick a remodeler and use them, integrate them into the design, and work with them to build the scope of work.  However, for smaller projects where…